The project is located 10 km from Kuala Lipis, between Jalan Kuala Lipis and
Padang Tengku. The project components is:
i. Single-storey terrace house (20’ x 70’) - 21 units
The expected duration of the project is between 2020-2022 (24 months).
Perbadanan Kemajuan Negeri Pahang
Tingkat 16, Kompleks Teruntum,
Jalan Mahkota, 25000 Kuantan,
Pahang Darul Makmur.
Hari Ini 2841
Semalam 4550
Minggu Ini 22499
Bulan Ini 36447
Keseluruhan 3366371
Layari Laman Web
Melalui Telefon Pintar
Tarikh Kemaskini